Tamil Nadu Power Generation Corporation Limited

Tamil Nadu Power Generation Corporation Limited
Company typeState-owned enterprise
IndustryElectric power generation
PredecessorTamil Nadu Generation and Distribution Corporation
Founded2024
HeadquartersChennai, Tamil Nadu, India
Area served
Tamil Nadu
Key people
  • Dr. J Radhakrishnan IAS Chairman
  • M Govinda Rao IAS MD
ProductsElectricity
ServicesPower generation
Revenue17,292.57 crore (US$2.0 billion) (2024–25) [1]
4,367.33 crore (US$520 million) (2024–25)[1]
−2,228.92 crore (US$−260 million) (2024–25)[1]
Total assets82,907.49 crore (US$9.8 billion) (2024–25)[1]
Total equity−40,719.30 crore (US$−4.8 billion) (2024–25)[1]
ParentTNEB Limited
Websitewww.tnpgcl.org


Tamil Nadu Power Generation Corporation Limited (TNPGCL) is a state-owned electric power generation company headquartered in Chennai, Tamil Nadu, India. The corporation is responsible for operating thermal and gas-based power plants in the state and generating electricity for the Tamil Nadu power grid. It functions as a subsidiary of TNEB Limited and operates under the administrative control of the Government of Tamil Nadu.[2]

The company was formed in 2024 following the restructuring of the Tamil Nadu Generation and Distribution Corporation (TANGEDCO), under which the power generation, power distribution and renewable energy operations were separated into independent companies.[3]

History

Electricity generation and distribution in Tamil Nadu were historically managed by the Tamil Nadu Electricity Board (TNEB). In 2010, the board was reorganised into a holding company called TNEB Limited, with separate subsidiaries for transmission and generation-distribution activities.

In 2024, the Government of Tamil Nadu further restructured TANGEDCO to improve operational efficiency and financial management. The restructuring created three new companies:

Following this reorganisation, thermal power stations and gas turbine plants previously managed by TANGEDCO were transferred to TNPGCL.[4]

Operations

TNPGCL operates coal-based thermal power stations and gas turbine power plants across Tamil Nadu. These facilities form an important component of the state's electricity supply and help meet peak power demand.[5]

Installed capacity

Source Installed capacity
Coal-based thermal power ~8,640 MW
Gas turbine power ~515 MW
Total installed capacity ~9,155 MW

Operational power stations

Power station Location District Fuel type Units Capacity (MW) Commissioned Ownership
North Chennai Thermal Power Station Athipattu Pudunagar Chennai Coal 3 × 210 MW, 2 × 600 MW, 1 x 800 MW 2,630 MW 1995–2019 Tamil Nadu Power Generation Corporation Limited
Vallur Thermal Power Station Vallur Thiruvallur Coal 3 × 500 MW 1,500 MW 2012–2015 Joint venture (NTPC-TNEB Energy Co. Ltd)
Mettur Thermal Power Station Mettur Salem Coal 4 × 210 MW, 1 x 600 MW 1140 MW 1987–2012 Tamil Nadu Power Generation Corporation Limited
Tuticorin Thermal Power Station Thoothukudi Thoothukudi Coal 5 × 210 MW 1,050 MW 1979–1993 Tamil Nadu Power Generation Corporation Limited
NTPL Thermal Power Station Thoothukudi Thoothukudi Coal 2×500 MW 1,000 MW 2015 Joint venture (NLC Tamil Nadu Power Ltd)
Udangudi Super Critical Thermal Power Station Udangudi Thoothukudi Coal 2×660 MW 1,320 MW 2026 Tamil Nadu Power Generation Corporation Limited
Basin Bridge Gas Turbine Power Station Basin bridge Chennai Natural gas 4 × 30 MW 120 MW 1996 Tamil Nadu Power Generation Corporation Limited
Valuthur Gas Turbine Power Station Valuthur Ramanathapuram Natural gas Combined cycle 187 MW 2003 Tamil Nadu Power Generation Corporation Limited
Thirumakottai Gas Turbine Power Station Thirumakkottai Thiruvarur Natural gas Combined cycle 107.88 MW 2001 Tamil Nadu Power Generation Corporation Limited
Kuthalam Gas Turbine Power Station Kuthalam Mayiladuthurai Natural gas Combined cycle 101 MW 2003 - 2004 Tamil Nadu Power Generation Corporation Limited

Power stations under construction

Power station Location District Fuel type Units Capacity (MW) Status
Ennore Thermal Power Station (Replacement Project) Ennore Chennai Coal 1 × 660 MW 660 Under construction
Ennore SEZ Supercritical Thermal Power Project Ennore Chennai Coal 2 × 660 MW 1,320 Under construction
Uppur Thermal Power Project Uppur Ramanathapuram Coal 2 × 800 MW 1,600 Construction stalled

Decommissioned power stations

Power station Location District Fuel type Units Capacity (MW) Year retired
Ennore Thermal Power Station (Old units) Ennore Chennai Coal 2 × 60 MW, 3 x 110 MW 450 MW 2017

See also

References

  1. ^ a b c d e "Annual Report 2024-25" (PDF). TNPGCL.
  2. ^ "TANGEDCO splits into two corporations". The Times of India. 3 February 2024. Retrieved 16 March 2026.
  3. ^ "After restructure, Tangedco to delineate property rights". The New Indian Express. 13 March 2024. Retrieved 16 March 2026.
  4. ^ "TANGEDCO splits into two corporations". The Times of India. Retrieved 16 March 2026.
  5. ^ "Thermal units revamped to beat summer demand". The Times of India. Retrieved 16 March 2026.